Loading...
HomeMy WebLinkAboutORD 2006-01 - Board TRUCKEE DONNER Public Utility District Ordinance No. 2006 - 01 AMENDING THE ELECTRIC CONNECTION CHARGES WHEREAS District staff has prepared a budget for District operation for 2006; and WHEREAS, on January 4, 2006, a public hearing was held to receive comments from the public concerning the 2006 budget; and WHEREAS the budget for 2006 recommends that electric connection charges be increased to cover increases in costs of providing District services; and WHEREAS on January4,2006,a public hearing was held to receive public comments on proposed rate increases; NOW, THEREFORE, BE IT ENACTED by the Board of Directors of the Truckee Donner Public Utility District as follows: Effective 60 days from the date this ordinance is adopted the following electric connection charge schedule shall be effective. ELECTRIC CONNECTION FEES Size and Type of Service Connection Fee A. Single phase, 120/240 service—200 amp Three-wire overhead 1) Temporary Actual cost 2) Permanent connection to structure $1,212 3) Temporary connection to customer-owned power pole and $1,489 subsequent transfer to structure B. Single phase, 120/240 service—200 amp Three-wire underground (overhead transformer) 1) Permanent connection to structure $1,212 2) Temporary connection to customer-owned power pole; $1,489 removal of same and installation of underground permanent service to structure C. Single phase, 120/240 service—200 amp Three-wire underground (padmount transformer) 1) Permanent connection to structure $1,212 2) Temporary connection to customer-owned power pole; $1,489 removal of same and installation of underground permanent service to structure Ordinance 2006-01 1 D. Single phase, 120/240 service—400 amp Three-wire underground or overhead 1) Permanent connection to structure $2,295 2) Temporary connection to customer-owned power pole; $2,572 removal of same and installation of underground permanent service to structure E. Three phase, 208v, 240v or 480v service Four-wire overhead 1) Permanent connection to structure Actual Cost 2) Temporary single phase 120/240 service for construction Actual Cost purposes to become three-phase permanent service to structure Section 3. If no protest is made pursuant to Public Utilities Code Section 16078, then this ordinance shall be effective sixty days after adoption by the board of directors of the District. Section 4. The Clerk of the District shall immediately cause a copy of this ordinance to be published in a newspaper of general circulation and posted in three places within the District. �-. Section 5. The provisions of other Ordinances shall remain if effect to the extent that they do not conflict with this ordinance. PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a meeting duly called and held within the District on the eighteenth day of January 2006 by the following roll call vote: AYES: Directors Aguera, Taylor and Hemig NOES: Director Thomason ABSENT: Director Sutton TRUCK E ONN UBLIC UT L TY DISTRICT A By J. n emig, President of the Board ATTEST: . Peter L. Holzmeister, Clerk of the Board Ordinance 2006-01 2