HomeMy WebLinkAboutORD 2006-01 - Board TRUCKEE DONNER
Public Utility District
Ordinance No. 2006 - 01
AMENDING THE ELECTRIC CONNECTION CHARGES
WHEREAS District staff has prepared a budget for District operation for 2006; and
WHEREAS, on January 4, 2006, a public hearing was held to receive comments from the public
concerning the 2006 budget; and
WHEREAS the budget for 2006 recommends that electric connection charges be increased to cover
increases in costs of providing District services; and
WHEREAS on January4,2006,a public hearing was held to receive public comments on proposed rate
increases;
NOW, THEREFORE, BE IT ENACTED by the Board of Directors of the Truckee Donner Public Utility
District as follows:
Effective 60 days from the date this ordinance is adopted the following electric connection charge
schedule shall be effective.
ELECTRIC CONNECTION FEES
Size and Type of Service Connection Fee
A. Single phase, 120/240 service—200 amp
Three-wire overhead
1) Temporary Actual cost
2) Permanent connection to structure $1,212
3) Temporary connection to customer-owned power pole and $1,489
subsequent transfer to structure
B. Single phase, 120/240 service—200 amp
Three-wire underground (overhead transformer)
1) Permanent connection to structure $1,212
2) Temporary connection to customer-owned power pole; $1,489
removal of same and installation of underground
permanent service to structure
C. Single phase, 120/240 service—200 amp
Three-wire underground (padmount transformer)
1) Permanent connection to structure $1,212
2) Temporary connection to customer-owned power pole; $1,489
removal of same and installation of underground
permanent service to structure
Ordinance 2006-01 1
D. Single phase, 120/240 service—400 amp
Three-wire underground or overhead
1) Permanent connection to structure $2,295
2) Temporary connection to customer-owned power pole; $2,572
removal of same and installation of underground permanent
service to structure
E. Three phase, 208v, 240v or 480v service
Four-wire overhead
1) Permanent connection to structure Actual Cost
2) Temporary single phase 120/240 service for construction Actual Cost
purposes to become three-phase permanent service to
structure
Section 3. If no protest is made pursuant to Public Utilities Code Section 16078, then this ordinance
shall be effective sixty days after adoption by the board of directors of the District.
Section 4. The Clerk of the District shall immediately cause a copy of this ordinance to be published in a
newspaper of general circulation and posted in three places within the District.
�-. Section 5. The provisions of other Ordinances shall remain if effect to the extent that they do not conflict
with this ordinance.
PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a
meeting duly called and held within the District on the eighteenth day of January 2006 by the following roll
call vote:
AYES: Directors Aguera, Taylor and Hemig
NOES: Director Thomason
ABSENT: Director Sutton
TRUCK E ONN UBLIC UT L TY DISTRICT
A
By
J. n emig, President of the Board
ATTEST: .
Peter L. Holzmeister, Clerk of the Board
Ordinance 2006-01 2