Ordinance No. 2008 - 02
AMENDING THE ELECTRIC CONNECTION CHARGES
WHEREAS the District's current Electric Connection charges were established on January 18, 2006;and
WHEREAS, the Electric Fee Schedule was established on September 6, 2006; and
WHEREAS, the costs of materials and labor have increased since the last adjustment to the electric
connection and fee schedule charges; and
WHEREAS, on February 6, 2008, a public hearing was held to receive public comments on the proposed
rate increases;
NOW, THEREFORE, BE IT ENACTED by the Board of Directors of the Truckee Donner Public Utility
District as follows:
Effective 60 days from the date this ordinance is adopted the following electric connection charge schedule
shall be effective.
ELECTRIC CONNECTION FEES
Size and Type of Service Connection Fee
A. Single phase, 120/240 service—200 amp
Three-wire overhead
1) Temporary Actual cost
2) Permanent connection to structure $1,248
3) Temporary connection to customer-owned power pole and $1,534
subsequent transfer to structure
B. Single phase, 120/240 service—200 amp
Three-wire underground (overhead transformer)
1) Permanent connection to structure $1,248
2) Temporary connection to customer-owned power pole; $1,534
removal of same and installation of underground
permanent service to structure
C. Single phase, 120/240 service—200 amp
Three-wire underground (padmount transformer)
1) Permanent connection to structure $1,248
2) Temporary connection to customer-owned power pole; $1,534
removal of same and installation of underground
permanent service to structure
Ordinance 2008-02 1
... D. Single phase, 120/240 service—400 amp
Three-wire underground or overhead
1) Permanent connection to structure $2,364
2) Temporary connection to customer-owned power pole; $2,649
removal of same and installation of underground permanent
service to structure
E. Three phase, 208v, 240v or 480v service
Four-wire overhead
1) Permanent connection to structure Actual Cost
2) Temporary single phase 120/240 service for construction Actual Cost
purposes to become three-phase permanent service to
structure
Overhead to Underground upgrade or relocate, up to 200 amp panel $1,248
Overhead relocate $371
400 amp upgrade $1,854
Temporary overhead service $773
loom.
Overhead to Underground upgrade or relocate, up to 200 amp panel, $1,534
with TPP (Temp to Permanent Installation)
Section 3. This ordinance shall be effective sixty days after adoption by the board of directors of the
District.
Section 4. The Clerk of the District shall immediately cause a copy of this ordinance to be published in a
newspaper of general circulation and posted in three places within the District.
Section 5. The provisions of other Ordinances shall remain in effect to the extent that they do not conflict
with this ordinance.
PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a
meeting duly called and held within the District on the day of February 6,2008 by the following roll call vote:
AYES: Directors Aguera, Hemig, Sutton and Thomason
NOES: None
ABSENT: Director Taylor
TRUCKEE DONNER PUBL C UTILITY DISTRICT
Y
Tim F. Taylor, President of the Board
AT�T: .
Michael D. Holley, Clerk of the Board