HomeMy WebLinkAboutORD 2008-02 - Board TRUCKEE DONNE! F Ordinance No. 2008 - 02 AMENDING THE ELECTRIC CONNECTION CHARGES WHEREAS the District's current Electric Connection charges were established on January 18, 2006;and WHEREAS, the Electric Fee Schedule was established on September 6, 2006; and WHEREAS, the costs of materials and labor have increased since the last adjustment to the electric connection and fee schedule charges; and WHEREAS, on February 6, 2008, a public hearing was held to receive public comments on the proposed rate increases; NOW, THEREFORE, BE IT ENACTED by the Board of Directors of the Truckee Donner Public Utility District as follows: Effective 60 days from the date this ordinance is adopted the following electric connection charge schedule shall be effective. ELECTRIC CONNECTION FEES Size and Type of Service Connection Fee A. Single phase, 120/240 service—200 amp Three-wire overhead 1) Temporary Actual cost 2) Permanent connection to structure $1,248 3) Temporary connection to customer-owned power pole and $1,534 subsequent transfer to structure B. Single phase, 120/240 service—200 amp Three-wire underground (overhead transformer) 1) Permanent connection to structure $1,248 2) Temporary connection to customer-owned power pole; $1,534 removal of same and installation of underground permanent service to structure C. Single phase, 120/240 service—200 amp Three-wire underground (padmount transformer) 1) Permanent connection to structure $1,248 2) Temporary connection to customer-owned power pole; $1,534 removal of same and installation of underground permanent service to structure Ordinance 2008-02 1 ... D. Single phase, 120/240 service—400 amp Three-wire underground or overhead 1) Permanent connection to structure $2,364 2) Temporary connection to customer-owned power pole; $2,649 removal of same and installation of underground permanent service to structure E. Three phase, 208v, 240v or 480v service Four-wire overhead 1) Permanent connection to structure Actual Cost 2) Temporary single phase 120/240 service for construction Actual Cost purposes to become three-phase permanent service to structure Overhead to Underground upgrade or relocate, up to 200 amp panel $1,248 Overhead relocate $371 400 amp upgrade $1,854 Temporary overhead service $773 loom. Overhead to Underground upgrade or relocate, up to 200 amp panel, $1,534 with TPP (Temp to Permanent Installation) Section 3. This ordinance shall be effective sixty days after adoption by the board of directors of the District. Section 4. The Clerk of the District shall immediately cause a copy of this ordinance to be published in a newspaper of general circulation and posted in three places within the District. Section 5. The provisions of other Ordinances shall remain in effect to the extent that they do not conflict with this ordinance. PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a meeting duly called and held within the District on the day of February 6,2008 by the following roll call vote: AYES: Directors Aguera, Hemig, Sutton and Thomason NOES: None ABSENT: Director Taylor TRUCKEE DONNER PUBL C UTILITY DISTRICT Y Tim F. Taylor, President of the Board AT�T: . Michael D. Holley, Clerk of the Board Ordinance 2008-02 2