Resolution No. 2009 - 39
AUTHORIZING THE ACCEPTANCE OF
DISTRICT PIPELINE REPLACEMENT - 2009 PROJECT - CONTRACT B
AND DIRECTING FILING OF THE NOTICE OF COMPLETION
WHEREAS, the Board of Directors of the Truckee Donner Public Utility District made the determination to
undertake the District Pipeline Replacement—2009 Project—Contract B; and
WHEREAS, Hunt's Excavating was selected by the District to perform the work; and
WHEREAS, Hunt's Excavating has completed all of the work included in the Project; and
WHEREAS,the District's Water System Engineer, Neil Kaufman, nowcertifies the completion of the project;and
WHEREAS,the District's Water Utility Manager, Ed Taylor, has recommended that the work be accepted bythe
District;
NOW THEREFORE BE IT RESOLVED by the Board of Directors of the District as follows:
1. That the District hereby accepts the District Pipeline Replacement—2009 Project—Contract B as
complete.
2. That the Clerk of the District be directed to file with the County of Nevada the Notice of Completion, a
copy of which is attached hereto.
3. That 35 days following the filing of the Notice of Completion, the monies retained from the contractor
payments be released to the contractor if no claims have been made to the District by material suppliers,
laborers or sub-contractors.
PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the District on the
second day of December 2009 by the following roll call vote:
AYES: Directors Aguera, Bender, Hemig and Hillstrom
NOES: None
ABSTAIN: None
ABSENT: Director Sutton
TRUCKEE DO BLIC UTILITY DISTRICT
By
Je a r, resident of the Board
ATTEST:
� b
Michael D. Holley, Clerk of the Board
Analysis of Bid Quantities vs.Actual Quantities Constructed Attachment 1
District Pipeline Replacement-2009-Contract B
Contractor:Hunt's Excavating
Bid Amounts Actual Amounts
Bid Item Description Quantity Units I Unit Price Sublolal Quanlit Units I Unit Price Subtotal
1 Mobilization 1 LS $ 14,500.00 $ 14,500.00 1 LS $ 14,500.00 $ 14,500.00
1A 8"Water Main 771 FT $ 36.00 $ 27,756.00 814 FT $ 36.00 $ 29,304.00
1B 1.5"PE Water Service Lateral 280 FT $ 53.00 $ 14,840.00 296 FT $ 53.00 $ 15,688.00
1C Single Water Service 2 EA $ 1,600.00 $ 3,200.00 2 EA $ 1,600.00 $ 3,200.00
1D Double Water Service 7 EA $ 1,800.00 $ 12,600.00 7 EA $ 1,800.00 $ 12,600.00
1E Fire Hydrant Assembly 2 EA $ 4,625.00 $ 9,250.00 2 EA $ 4,625.00 $ 9,250.00
1F Connection to Existing 8"Piping at Station 0+00 1 LS $ 3,900.00 $ 3,900.00 1 LS $ 3,900.00 $ 3,900.00
1G Tee/Valve Assembly at Station 6+85 1 LS $ 6,500.00 $ 6,500.00 1 LS $ 6.500.00 $ 6,500.00
1H Connection to Existing 8"Piping at Station 7+71.10 1 LS $ 4.100.00 $ 4,100.00 1 LS $ 4,100.00 $ 4,100.00
11 Rock Excavation 4 HRS $ 390.00 $ 1.560.00 0 HRS $ 390.00 $ -
1J A.C.Pavement and Base 5,450 SF $ 5.00 $ 27,250.00 6,965 SF $ 5.00 $ 34,824.38
1K All Other Work Required by the Contract Documents 1 LS $ 2,800.00 $ 2,800.00 1 LS $ 2,800.00 $ 2,800.00
2A 8"Water Main 1,000 FT $ 29.00 $ 29.000.00 133 FT $ 29.00 $ 3,857.00
2B 8"and 12"Water Mains 929 FT $ 54.00 $ 50,166.00 0 FT $ 54.00 $ -
2C 12"Water Main 1,483 FT $ 41.00 $ 60.803.00 0 FT $ 41.00 $
2D 1.5"PE Water Service Lateral 720 FT $ 49.00 $ 35.280.00 0 FT $ 49.00 $
2E Double Water Service 20 EA $ 1,925.00 $ 38,500.00 0 EA $ 1,925.00 $
2F Double Water Service with Internal PRV 2 EA $ 2,870.00 $ 5,740.00 0 EA $ 2,870.00 $
2G Double Water Service for Lower Pressure Areas 2 EA $ 3,950.00 $ 7,900.00 0 EA $ 3,950.00 $ -
2H Fire Hydrant Assembly 6 EA $ 4,625.00 $ 27,750.00 0 EA $ 4,625.00 $
21 1"Air Valve Assembly 2 EA $ 350.00 $ 700.00 0 EA $ 350.00 $ -
2.1 Connection to Existing 6"Piping at Station 0+00 1 LS $ 3,800.00 $ 3,800+00 0 LS $ 3,800.00 $
2K Tee/Valve Assembly at Station 0+28 1 LS $ 4,250.00 $ 4,250.00 0 LS $ 4.250.00 $ -
2L Elbow Connection at Station 3+12 1 LS $ 2,850,00 $ 2,850.00 0 LS $ 2,850,00 $ -
2M Offset at Station 12+41 1 LS $ 6,675.00 $ 6,675.00 0 LS $ 6,675.00 $
2N Tee/Valve Assembly at Station 15+21 1 LS $ 4.875.00 $ 4,875.00 0 LS $ 4,875.00 $ -
20 Tee/Valve Assembly at Station 27+24 1 LS $ 9,800.00 $ 9,800.00 0 LS $ 9,800.00 $ -
2P Connection to Existing 8"Piping at Station 34+12.26 1 LS $ 4,200.00 $ 4,200.00 1 LS $ 4,200.00 $ 4,200.00
2O Rock Excavation 16 HRS $ 390.00 $ 6,240.00 16.75 HRS $ 390.00 $ 6,532.50
2R A.C.Pavement and Base 20,350 SF $ 5.00 $ 101,750.00 286 SF $ 5.00 $ 1,430.00
2S All Other Work Required by the Contract Documents 1 LS $ 5,000.00 $ 5,000.00 0.03 LS $ 5,000.00 $ 150.00
3A 12"Water Main 601 FT $ 49.00 $ 29,449.00 0 FT $ 49.00 $ -
38 Fire Hydrant Assembly 1 EA $ 4,625.00 $ 4,625.00 0 EA $ 4,625.00 $
3C Cut Off Wall 1 EA $ 1,400.00 $ 1,400.00 0 EA $ 1,400.00 $ -
3D Connection to Existing 8"Piping at Station 0+00 1 LS $ 4,210.00 $ 4,210.00 0 LS $ 4,210.00 $
3E Tee/Valve Assembly at Station 0+18 1 LS $ 4,400.00 $ 4,400.00 0 LS $ 4.400.00 $ -
3F Tee/Valve Assembly at Station 0+70 1 LS $ 7,800.00 $ 7,800.00 0 LS $ 7,800.00 $
3G Tee/Valve Assembly at Station 2+90 1 LS $ 8,000.00 $ 8,800.00 0 LS $ 8,800.00 $ -
3H Connection to New 12"MJ Elbow at Station 6+01.01 1 LS $ 750.00 $ 750.00 0 LS $ 750.00 $ -
31 Rock Excavation 2 HRS $ 390.00 $ 780.00 0 HRS $ 390.00 $
3.1 A.C.Pavement and Base 1,975 SF $ 5.00 $ 9,875.00 0 SF $ 5.00 $
3K All Other Work Required by the Contract Documents 1 LS $ 3,500.00 $ 3,500.00 0 LS $ 3,500.00 $ -
4A 4"Water Main 142 FT $ 28.00 $ 3,976.00 147 FT $ 28.00 $ 4,116.00
4B 8"Water Main 2,522 FT $ 31.00 $ 78,182.00 2,508 FT $ 31.00 $ 77,748.00
4C 12"Water Main 755 FT $ 49.00 $ 36,995.00 740 FT $ 49.00 $ 36,260.00
4D 1.5"PE Water Service Lateral 1,230 FT $ 49.00 $ 60,270.00 1,448 FT $ 49.00 $ 70,952.00
4E Single Water Service 1 EA $ 550.00 $ 550.00 1 EA $ 550.00 $ 550.00
4F Double Water Service 34 EA $ 1,765.00 $ 60,010.00 34 EA $ 1,765.00 $ 60,010.00
4G Double Water Service for Lower Pressure Areas 6 EA $ 1,600.00 $ 9,600.00 5 EA $ 1,600.00 $ 8,000.00
4H Fire Hydrant Assembly 7 EA $ 4,525.00 $ 32,375.00 7 EA $ 4,625.00 $ 32.375.00
41 1"Air Valve Assembly 1 EA $ 3,350.00 $ 3,350.00 1 EA $ 3.350.00 $ 3.350.00
4.1 TeeNalve Assembly at Station 1+42 1 LS $ 4,800+00 $ 4,800.00 1 LS $ 4.800.00 $ 4,800.00
4K Tee/Valve Assembly at Station 14+68 1 LS $ 3,100.00 $ 3,100.00 1 LS $ 3.100.00 $ 3,100.00
41- Tee/Valve Assembly at Station 26+64 1 LS $ 9,500.00 $ 9,500.00 1 LS $ 9,500.00 $ 9,500.00
4M TeeNalve Assembly at Station 33+80 1 LS $ 8,500.00 $ 8,500.00 1 LS $ 8,500.00 $ 8,500.00
4N Connection to Existing 8"Piping at Station 34+18.81 1 LS $ 3,200.00 $ 3.200.00 1 LS $ 3,200.00 $ 3,200.00
40 Rock Excavation 16 HRS $ 390.00 $ 6,240.00 126.25 HRS $ 390.00 $ 49,237.50
4P A.C.Pavement and Base 22,525 SF $ 5.00 $ 112,625.00 31,840.75 SF $ 5.00 $ 159,203.75
40 All Other Work Required by the Contract Documents 1 LS $ 6,800.00 $ 6,800.00 1 LS $ 6.800.00 $ 6.800.00
6 Credit for District Furnished Equipment 1 LS $(12,040.00) $ (12,040.00) 1 LS $ 11.657.42 $ 11,65T42
$1,037,157.00 $ 702,195.55
Amount of Contract Reduction: $ 334.961,45
Attachment 2
TRUCKEE
O
Chan
� ge Order
Public Utility District
Contract Name: District Pipeline Replacement—2009—Contract B
Contract Change Order No: 9 Orig. Contract Amt. $ 1,037,157.00 Days NA
Date: November 18, 2009 Prev.Apprd Changes $ 85,003.96 Days 7.9
Contractor: Hunt's Excavating This Change$ -310,722.20 Days 0
Revised Contract Amt. $ 811,438.76 Days 7.9
This Change Order covers changes to the subject Contract as described herein. The Contractor shall construct,
furnish equipment and materials, and perform all work as necessary or required to complete the Change Order
Items for a lump sum price agreed upon between the Contractor and District.
Increase in (Decrease) Contract Time
Contract in Contract Extension
Description of Changes Amount $ Amount $ (days)
1 —Bid vs. Actual Quantities $334,961.45 0.0
2—Additional Pavement Thickness on Skiview Loop and
Sierra Glen $23,344.57 0.0
3—Additional Curb $629.20 0.0
4—Connection to Existing Water Service $265.48 0.0
Totals $24,239.25 $334,961.45 0.0
Net change in contract amount(increase or decrease) $310,722.20 0.0
The amount of the Contract will be decreased by the sum of $310,722.20 and the Contract Time shall not be
extended. The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the
contract price specified for each item including any and all supervision costs and other miscellaneous costs
relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on
account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other
necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete
the Change order items. This document will become a supplement of the contract and all provisions will apply
hereto. It is understood that the Change Order shall be effective when approved by the District.
Accepted: /Contractor Date:
(Signature)
., Approved: /District Date:
(Signature)
Page 1
RECORDING REQUESTED BY:
Truckee Donner Public Utility District '
Nevada County Recorder
WHEN RECORDED, RETURN TO: Gregory J. Diaz
Document* 20090032680
TRUCKEE DONNER PUBLIC UTILITY DISTRICT yyecinesday December 09 2009,at 10:32:56 AM
Post Office Box 309
Truckee, CA 96160 paid: EM
THE UNDERSIGNED DECLARES
DOCUMENTARY TRANSFER TAX-NONE
COPY
NOTICE OF COMPLETION
NOTICE IS HEREBY GIVEN:
1. That the name and address of the public entity for whom the improvement project was done, as owner
thereof, is the Truckee Donner Public Utility District, Post Office Box 309, Truckee, CA 96160.
2. Nature of interest or estate of owner: beneficial interest of a public utility easement for installation of water
facilities.
3. That on December 2"d, 2009 the hereinafter described improvements were accepted as complete
pursuant to Resolution 2009-39 of the Truckee Donner Public Utility District, the awarding authority.
4. That the subject improvements of the Notice are generally described and identified as follows:
District Pipeline Replacement—2009 Project—Contract B — Oslo Drive, Sierra Glen Way, Skiview
Loop, and Tyrol Road, Truckee, California.
5. That the name and address of the contractor for such project was: Hunt's Excavating, PO Box 2154,
Stateline, NV 89449.
a
I certify under penalty of perjury under the laws of the State of
California that the foregoing is true and correct.
Dated: {a1,31 TRUCKEE DONNER PUBLIC UTILITY DISTRICT
B -0
Michael D. Holley, General Manager
MAIL TAX STATEMENTS TO: