HomeMy WebLinkAboutORD 2012-02 - Board ,ell III
TRUCKEE DONNER
Ordinance No. 2012 - 02
Amending Water Connection Fees
WHEREAS the District's current Connection Fee schedule was established on
February 6, 2008; and
WHEREAS, the District has been experiencing increased costs for labor, fuel,
materials and other items since that time; and
WHEREAS on September 5, 2012 a public hearing was held to receive public
comments on the proposed Water Connection Fee increase;
NOW, THEREFORE, BE IT ORDAINED that the Board of Directors of the Truckee
Donner Public Utility District does hereby enact the following:
1. Connection fees are charged to reimburse the District for the actual
administrative, material and labor costs of connecting to the water system
(excluding the service lateral).
2. Connection fees shall be charged according to the following schedule:
METER SIZE CONNECTION
inches FEE
5/8 x 3/4 $1,290
3/4 $1,330
1 $1,430
1 Y2 Actual cost
2 Actual cost
3 Actual cost
4 Actual cost
6 Actual cost
3. This ordinance shall be effective sixty (60) days after the date it was adopted by
the Board of Directors.
Page 1 Ordinance 2012-02
4. The Clerk of the District shall immediately cause a copy of this ordinance to be
published in a newspaper of general circulation and posted in three places
T within the District.
PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within
the District on the third day of October 2012 by the following roll call vote:
AYES: Directors Aguera, Bender, Hemig and Laliotis
NOES: None
ABSTAIN: None
ABSENT: None
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
Tony Laliotis, President
ATTEST:
Michael D. Holley, Di Jerk
Page 2 Ordinance 2012-02