HomeMy WebLinkAboutRES 1996-08 - Board RESOLUTION NO. 9608
OF THE
TRUGKEE DONNER PUBLIC UTILITY DISTRICT
APPROVING PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS
AND ISSUING A CALL FOR BIDS ON THE
1996 TAHOE DONNER PIPELINE REPLACEMENT
WHEREAS, District staff has recommended, and the Board of Directors of the Truckee
Donner Public Utility District have agreed, to go forward with the 1996 Tahoe Donner
Pipeline Replacement, and
WHEREAS, Sauers Engineering, Inc. has prepared plans, specifications and contract
documents for the project; and
WHEREAS, Sauers Engineering has prepared and filed all the environmental documents
as required by the California Environmental Quality Act, and
WHEREAS, Certificates of Participation funds have been designated in the 1996 Budget
for this Pipeline Replacement Project,
�^ NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee Donner
Public Utility District as follows:
1. That the plans, specifications and bidding documents on file in the District
office be approved and advertised in an appropriate manner.
2. That the date and time of the bid opening be scheduled for 2:00 PM on
April9, 1996.
PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held
within the District on the sixth day of March 1996 by the following roll call vote:
AYES: Aguera, Jones, Maass, Sutton and Hemig.
NOES: None.
ABSENT.- None.
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
Peter L. H meiste , lerk of the Board
ATT
Susan M. Craig, Deputy Distri6ilClerk
smc