HomeMy WebLinkAboutRES 1986-17 - Board RESOLUTION NO. 8617
OF THE
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
ESTABLISHING DISTRICT POLICY REGARDING PROCEDURES
FOR ELECTRIC SERVICE APPLICATIONS FOR NEW COOSTRUCT105 AND
UPGRADES AND THE PROCESSING OF SAME
(Electric Rule No. 9)
WHEREAS, the public interest is to be served by a consistent, concise and
understandable proceeding for processing electric service applications for
new construction and upgrades; and
WHEREAS, there is a specific need for a policy that cannot be misunderstood
by developers creating new projects within the Truckee Donner Public
Utility District service area; and
WHEREAS, a policy was adopted by Resolution No. 8421 on .the 16th day of
April 1984 , which established policy regarding procedures for electric
service applications and the processing of same; and
WHEREAS, the Board has determined the need to revise and update the policy
adopted in 1984;
NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee
Donner Public Utility District as follows:
t^
1 . That the policy regarding procedures for electric
service applications for new construction and
upgrades set forth in Exhibit "A" attached herwto is
hereby effective as of the date of this 'solntian.
2. That the General !Manager shall develop operational
methods for staff use to isplensat the intent of
this policy which shall be effective as of the date
of adoption.
3. That all previous policies relating to electric
service applications for new construction and
upgrades and their processing are hereby rescinded.
PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public
Utility District at a regular meeting held within said District on the 7th
day of July 1986 by the following roll call vote:
AYES: Cooley, Corbett , Hamilton and Maass.
NOES: None.
ABSENT: Sutton.
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
Ja A. Maass , President
ATTEST:
Susan M. Craig, Deputy Dist t er
d2.38
E-9-1
APPLICATION FOR SERVICE
POLICY ITEM: New construction and upgrades Electric Rule No. 9
Date issued: July 7 , 1986 Reference: Resolution No. 8617
Date effective: July 7 , 1986
TRUC[SE DOMM6R PUBLIC UTILITY DISTRICT
P O L I C Y S T A T E M E ■ T
9.1 Applications for electrical service shall be defined as an electrical
project as used in this rule.
9.2 Electrical project applications shall be processad is accordance with
the Electrical Project Review Gnidelisas - Attacharse No. I.
9.3 The applicant shall be responsible for all District mats ioearred in
the
11�Ml�ldaMi �
14
T
UTILITY DISTRICT
RUTIO GUIDELINES
;< AWNISTRATIVE ACTION REQ0IREMNTS
TIM a PROJECT * amoral Short fore Development board
r regiment o2reement approval
1
I. RESIDENTIAL ,
A. Service available
B. Line extension or facility ' l3
upgrade required `
1 ) Under $10,000 k„`$_ X X
2) Under $50,000 } �� X X
3) Over $50,000 .y X X X
I1. COIMICIAL AND INDUSTRIAL i <"
r k, 3
A. Service available ' '
fix+
B. Line extension or facility :, ;
upgrade required ,
1) Under $10,000 X X
2) Under $50,000 i � , 4a X X
3) Over $50,000 � •' X X X
f .
d6.22 _